Mechanical ventilation in a home must be commissioned. For a new home, the airflow rates must be tested and the results given to building control within five days of the final test (Building Regulations 2010, regulation 42). Installers registered with a ventilation competent person scheme (BESCA, Blue Flame Certification, Certsure/NICEIC or NAPIT) can self-certify the work.

Checked 23 November 2026

Wales

Wales has its own Approved Document F. Mechanical ventilation must be commissioned, and installers registered with a ventilation competent person scheme (BESCA, Blue Flame Certification, Certsure/NICEIC, NAPIT or Stroma) can self-certify the work. A new Approved Document F Volume 1 for Wales takes effect on 4 March 2027.

Checked 23 November 2026

Scotland

Scotland doesn't use the England and Wales competent person schemes for ventilation. Building standard 3.14 requires mechanical ventilation systems to be commissioned to show they work, and written operating and maintenance information to be provided. We haven't found an official Scottish requirement for a named installer qualification, so ask your local authority building standards team what they'll expect.

Checked 23 November 2026

Northern Ireland

Fixed mechanical ventilation must be tested and commissioned. The person doing the work must send the district council the airflow test results within five days of commissioning, and give the owner information on running and maintaining the system (Building Regulations (Northern Ireland) 2012, regulations 65 to 68).

Checked 23 November 2026

The commissioning record

Many installers use the BEAMA Part F ventilation commissioning sheet (checked 23 November 2026). Whatever form is used, you should end up with measured airflows for each room and the settings the unit was left on. Keep it – a servicing engineer will need it.

Qualifications to ask about

Ask for the individual fitter's certificate. See BPEC's domestic ventilation systems qualification (checked 23 November 2026). There is no public BPEC register to check it against.

Questions

Does Part F require MVHR?
In England, Part F does not require MVHR in every new home; other ventilation approaches are recognised. Wales has its own Part F. Scotland uses building standard 3.14 and Northern Ireland uses Part K. Check with your building control body.
What is an MVHR commissioning record?
In England, new-home airflow test results must be given to building control within five days of the final test. Wales requires commissioning under its own Part F. Scotland requires commissioning under standard 3.14. In Northern Ireland, airflow results go to the district council within five days of commissioning. Keep the measured airflow record.